Lead Time
1. PCB Lead Time:
2 layers 24-72 H
4 layers 36-96 H
6 layers 48-120 H
8 layers 84-144 H
10 layers 6 days
12 layers 7 days
16 layers 9 days
18 layers 10 days
20 layers 14 days
22 layers 16 days
24 layers 18 days
26-30 layers 22 days
We¡¯ll do seriously our services and ensure to deliver high quality products to our customers on time. For delay shipment resulting in serious influence, our company will take on responsibility bravely and compensate relevant economic loss, at the same time, we¡¯ll write out profound review and advance effective improvement project.
2. How fast we can?
Process |
Time |
Special Equipment/Tool/Methods |
Quotation |
©‚ 2 hours |
Auto-calculation Quotation Sheet and Standard Price Matrix |
Tooling Preparation |
< 4 Hours |
CAM Auto-panelization and Auto-generation Drill and Routing Program |
Board Cutting & Baking |
< 4 Hours |
Baking after board cutting to ensure the stablization and decrease the warpage rate |
Innerlayer Process |
< 4 Hours |
All Innerlayers process AOI, improve process pass yield. |
Multilayer Pressing |
< 8 Hours |
Combination Hot & Cooling pressing, save time and decrease the warpage rate |
Drilling |
<4 Hours |
2 or 3 Spindles drill machine that special made for QTA & HMLV Products |
PTH & Desmear |
<4 Hours |
Auotmatic PTH & Desmear Line, Special size for QTA & HMLV Products |
Dry Film |
< 2 Hours |
Scrubbing with Micro-etching process for pretreatment, improves the dry film adhesion |
Pattern Plating |
<3 Hours |
Automatic Plating Line, Save labor Cost and improve production yield and efficiency |
DES Line |
< 1 Hours |
Combination Line for Film Strip, Etching, and Tin Stripping, save process time |
1st E-test / |
< 2 Hours |
Process Test /AOI after Etching, improves production pass yield |
Solder Mask |
< 4 Hours |
Scrubbing with Micro-etching process for pretreatment, improves solder mask adhesion |
Surface Treatment |
< 3 Hours |
Joint venture investment for surface treatment with suppliers, save cost and decrease down time |
Profiling Process |
< 3 Hours |
1-2 Spindles routing machine that special made for QTA & HMLV PCBs |
E-test |
< 3 Hours |
Sample & HMLV PCBs using Flying probe test, Saving cost for customers |
FQC & Packing |
< 2 Hours |
/ |
Dispatch |
< 2 Hours |
Our factory location is special, there are two freeways nearby and you can arrive anywhere within two hours in Guangzhou, Shenzhen or Dongguan. |
Totally Lead time |
2 layers: |
High Quality with Fast Delivery is our advantage! |