Lead Time

1. PCB Lead Time:

2 layers     24-72   H
4 layers      36-96    H
6 layers      48-120  H
8 layers      84-144  H
10 layers       6 days
12 layers       7 days
16 layers       9 days
18 layers       10 days
20 layers       14 days
22 layers       16 days
24 layers       18 days
26-30 layers 22 days

We¡¯ll do seriously our services and ensure to deliver high quality products to our customers on time. For delay shipment resulting in serious influence, our company will take on responsibility bravely and compensate relevant economic loss, at the same time, we¡¯ll write out profound review and advance effective improvement project.

 

2. How fast we can?

Process

Time

Special Equipment/Tool/Methods

Quotation

©‚ 2 hours

Auto-calculation Quotation Sheet and Standard Price Matrix

Tooling Preparation

< 4 Hours

CAM Auto-panelization and Auto-generation Drill and Routing Program

Board Cutting & Baking

< 4 Hours

Baking after board cutting to ensure the stablization and decrease the warpage rate

Innerlayer Process

< 4 Hours

All Innerlayers process AOI, improve process pass yield.

Multilayer Pressing

< 8 Hours

Combination Hot & Cooling pressing, save time and decrease the warpage rate

Drilling

<4 Hours

2 or 3 Spindles drill machine that special made for QTA & HMLV Products

PTH & Desmear

<4 Hours

Auotmatic PTH & Desmear Line, Special size for QTA & HMLV Products

Dry Film

< 2 Hours

Scrubbing with Micro-etching process for pretreatment, improves the dry film adhesion

Pattern Plating

<3 Hours

Automatic Plating Line, Save labor Cost and improve production yield and efficiency

DES Line

< 1 Hours

Combination Line for Film Strip, Etching, and Tin Stripping, save process time

1st E-test /
AOI

< 2 Hours

Process Test /AOI after Etching, improves production pass yield

Solder Mask

< 4 Hours

Scrubbing with Micro-etching process for pretreatment, improves solder mask adhesion

Surface Treatment

< 3 Hours

Joint venture investment for surface treatment with suppliers, save cost and decrease down time

Profiling Process

< 3 Hours

1-2 Spindles routing machine that special made for QTA & HMLV PCBs

E-test

< 3 Hours

Sample & HMLV PCBs using Flying probe test, Saving cost for customers

FQC & Packing

< 2 Hours

/

Dispatch

< 2 Hours

Our factory location is special, there are two freeways nearby and you can arrive anywhere within two hours in Guangzhou, Shenzhen or Dongguan.

Totally Lead time

2 layers:
44Сʱ

High Quality with Fast Delivery is our advantage!